Al Raha Beach Development Project (Al Dana Infrastructure Phase 1) is located in Al Raha Beach – Abu Dhabi, U.A.E. Main client of the project is Aldar and the scope of the work include Dredging, Stockpiling and Levelling. Total Dredging Volume is 300,00 m3 and the project is still work in progress.
Project Name | Al Raha Beach Development Project (Al Dana Infrastructure Works Phase 1) |
---|---|
Client | Aldar |
Main Contractor | Ghantoot Transport & General Contracting LLC |
Scope of Works | Dredging, Stockpiling and Levelling |
Location | Al Raha Beach - Abu Dhabi |
Dredging Volume | 300,00 m3 |
Completion Date | 29/07/2014 |